Client / Site: North Yorkshire County Council, River Derwent Crossing
North Yorkshire County Council needed an urgent structural inspection of their 70-year-old River Derwent bridge – a critical highway link that couldn’t be closed for assessment.
The bridge’s underwater foundations presented multiple operational challenges:
Any closure of this vital transport route would have significant economic and social impact on the local community.
Dagger Diving deployed a specialist bridge inspection team with mobile equipment designed for rapid deployment in challenging riverine conditions.
Strategic Setup – We positioned a road-transportable dive control unit with modular equipment staged directly from the riverbank, eliminating the need for marine vessels in the shallow, fast-flowing river.
Engineered Access – Working with temporary works designers, we installed scaffolded dive platforms suspended beneath the bridge structure. This provided safe, stable working platforms whilst maintaining full highway access above.
Advanced Inspection Technology – Our surface-supplied divers used high-definition helmet cameras for real-time visual documentation, ultrasonic thickness gauges to measure concrete integrity, and pit gauges to assess any structural degradation.
Precision Planning – We conducted detailed hydrology reviews and time-critical dive planning to work safely within tidal flow patterns and challenging riverbed conditions.
Safety Protocols – All operations followed confined space procedures where required, with continuous gas monitoring and validated emergency egress plans ensuring diver safety in the restricted underwater environment.
Mission accomplished – comprehensive inspection delivered ahead of schedule with zero highway disruption.
Complete structural assessment results:
Our rapid deployment and precision survey techniques enabled North Yorkshire County Council to maintain this vital transport route whilst fulfilling their statutory bridge inspection duties.
Project delivered ensuring public safety and infrastructure compliance with zero operational disruption.
More case studies