Client / Site: NKT / Offshore Wind Farm – Renal Wind Farm
NKT required the safe cable removal of a retired subsea export line and the replacement of a compromised Vented Bellmouth Receptacle (VBR) — a funnel-shaped entry point that protects and guides power cables as they enter a wind turbine foundation.
This was not a straightforward task, as our team faced multiple challenges:
Dagger Diving mobilised an offshore-qualified air diving team supported by a vessel-based dive control system. From there, we began our operations, which involved working under a comprehensive Permit to Work system. Isolations were confirmed by NKT, the TSO, and the foundation operator.
Export Cable Removal:
VBR Replacement:
All subsea assets were inspected, and the condition of marine growth was logged to support future maintenance planning.
Mission Accomplished: The entire project was completed efficiently and without incident, ensuring cable removal and VBR replacement were delivered within the operational window.
Results achieved:
The success of the project meant the infrastructure was fully prepared for upcoming grid upgrades — all while maintaining live turbine operation.
Compliance: Delivered in line with IMCA D018, ISO 9001, ISO 14001, ISO 45001, and client HV interface procedures.
A Vented Bellmouth Receptacle (VBR) is a subsea entry point that guides and protects power cables as they are routed into offshore wind turbine foundations. The “vented” design reduces pressure changes and allows trapped air or water to escape during installation. Without a secure VBR, cables risk damage from abrasion, bending, or blockage — making VBR integrity critical for the long-term reliability of offshore power infrastructure.